SEE Facility:
SEE Vacuum Chamber
The working volume of our vacuum chamber is quite large. The beam comes from the beam diagnostics box through an entry port in the back wall of the magenta half of the chamber. There is enough room for entire systems, such as a spacecraft instruments, to be exercised or calibrated in the beam.
|
Chamber With Motion System |
There are two available access ports on the left side of the chamber and one port on the right side (when facing up the beam pipe). The ports on the left require about 15 feet of cable to reach the counting area. The port on the right side requires 20 feet. We have multiple flanges that can be installed to accomodate various types of cables:
-
A flange with 9 BNC Connectors
-
A flange with 6 BNC Connectors, 3 High Voltage Connectors
-
A flange with two 50 Pin Mass Termination Connectors
-
A flange with three 50 Pin D Connectors
We have adapters to convert a 50 Pin D Connector into:- Two 25 Pin D Connectors
- One 25 Pin D, a 15 Pin D and a 9 Pin D connector
Vacuum Chamber |